
Kitchen remodeling
We rebuild kitchens in Philadelphia, South Jersey and the nearby Pennsylvania suburbs, from layout and cabinetry to plumbing, wiring and finishes. One fixed price and one point of contact cover the whole job.
Kitchens
A kitchen run as one job
Layout, cabinetry, plumbing, electrical and finishes by one team, on one fixed price.
You get a clear fixed-price quote before work starts and one point of contact from start to finish. We pull the permits, run every trade in-house or through our subcontractors, and send regular progress updates with photos, so you know the status of the work and the next steps.
What's included
08 items- Layout and design changes
- Cabinets and countertops
- Plumbing for sinks, dishwashers and gas lines
- New circuits, outlets and lighting
- Range hood ventilation
- Walls opened, with engineer-coordinated structural work
- Flooring, tile and finishes
- Permits and inspections
One fixed price for all of it, agreed before work starts.
How a kitchen job works here
A kitchen touches more trades than any other room in the house. A new layout can move the sink, the range and the refrigerator, and each move drags plumbing, gas, wiring and ventilation with it. That is why we run the whole kitchen ourselves: structural, plumbing, electrical, HVAC and finishes on one schedule, with one person you call.
Most of our kitchens are in Philadelphia, where the Department of Licenses and Inspections (L&I) issues permits through its online system, eCLIPSE. We also work across the river in South Jersey and in the Pennsylvania suburbs, where the township or borough runs permits instead of the City.
Permits that apply
Philadelphia lists “cabinets and countertops”, painting and non-fibre floor coverings as work you can do without a permit, as long as the property is not on the Philadelphia Historic Register. Swap the boxes and the top in the same places and the City leaves you alone.
Change anything behind the walls and permits follow:
- Plumbing. A licensed master plumber has to oversee plumbing work in the city. Like-for-like faucet and valve repairs are exempt; a moved sink or a new dishwasher line is not.
- Electrical. The City requires a licensed electrical contractor for all electrical work, and the owner or their agent hires a licensed electrical inspection agency to inspect it.
- The EZ route. For a one-family house, L&I offers an EZ Bathroom and Kitchen permit with no plans. It covers work in the same footprint, done by a Philadelphia licensed plumbing contractor; the electrical work still needs its own permit. Most EZ permits are processed in five business days.
- Walls. Removing or cutting a wall that carries load takes the job out of the EZ track. That work needs a full building permit, and we bring in an engineer before anything comes down.
Applications filed with L&I on or after July 1, 2026 must follow the 2021 International Codes, with the 2020 National Electrical Code. In the Pennsylvania suburbs the state Uniform Construction Code treats “an ordinary repair” as permit-free, but adding or relocating piping, wiring or mechanical equipment is not an ordinary repair. In New Jersey, the town’s construction official issues permits under the state’s Uniform Construction Code, and plumbing and electrical work there must be done by New Jersey licensed contractors.
What the code asks of a new kitchen
The 2021 residential code, as Pennsylvania adopted it, sets a few kitchen rules worth knowing before you pick fixtures:
- A kitchen exhaust system has to move at least 100 cfm intermittent or 25 cfm continuous, so the hood you choose has to meet that and vent the way the code allows.
- Receptacles that serve countertop surfaces need GFCI protection, and so do outlets within 6 feet of a sink.
- Kitchen circuits need AFCI protection, and when branch-circuit wiring is modified, replaced or extended, the code brings in AFCI protection for that circuit too.
We plan the layout around these from the first visit so the inspector sees a kitchen built to the code in force.
What to prepare
Before the estimate visit, gather what you can:
- How you use the kitchen now and what doesn’t work.
- Photos or links to cabinets, counters and finishes you like.
- Appliance choices, or at least sizes and fuel (gas or electric).
- Anything you know about the house: its age, past work, whether it’s on the Historic Register.
We walk the room with you, listen and take measurements. That visit is free.
What changes cost and time
We can’t quote a kitchen from a web page, and we won’t publish prices that don’t fit your house. These are the decisions that move the number and the calendar most:
- Staying in the footprint or moving things. Keeping the sink, range and fridge where they are keeps the plumbing, gas and wiring work small. Moving them adds trades and permits.
- Which permit path. An EZ permit in Philadelphia is usually processed in five business days. A job that needs plans goes to plan review, which L&I sets at 15 business days for alterations to a one- or two-family house.
- Walls. Opening a bearing wall adds an engineer, a beam and a full building permit.
- Special-order materials. Custom cabinets and stone take time to make. Pennsylvania’s Home Improvement Consumer Protection Act requires the contract to list special-order materials separately from the down payment, so you see exactly what you are paying for up front.
How we run it
You get one point of contact from the first visit to the final walkthrough, and a fixed-price quote before work starts. We pull the permits, coordinate the engineer where structural work is involved, and schedule every trade in-house or through our subcontractors. As the work goes, we send regular progress updates with photos, so you always know the status and the next step. At the end we walk the finished kitchen with you, and we stand behind the work we complete.
Sources
- City of Philadelphia: Get a building permitphila.gov
- City of Philadelphia: Get permits without plans (EZ permits)phila.gov
- Philadelphia L&I: EZ Bathroom and Kitchen Alterations permit standard (2021 code)phila.gov
- City of Philadelphia: Get an electrical permitphila.gov
- City of Philadelphia: Get a plumbing permitphila.gov
- Philadelphia L&I Code Bulletin B-2501: Implementation of the 2021 International Codesphila.gov
- 2021 International Residential Code as adopted in Pennsylvania, Chapter 15: Exhaust Systems (UpCodes)up.codes
- 2021 International Residential Code as adopted in Pennsylvania, Chapter 39: Power and Lighting Distribution (UpCodes)up.codes
- PA Code § 403.62: Permit requirements and exemptionspacodeandbulletin.gov
- N.J.A.C. 5:23-2: Uniform Construction Code, administration (NJ Department of Community Affairs)nj.gov
- Home Improvement Consumer Protection Act, Act 132 of 2008 (Pennsylvania General Assembly)palegis.us
Trades on this job
The trades we bring in
All on one schedule, in-house or through our subcontractors, under one point of contact.
Structural
Walls, beams and floors, coordinated with an engineer.
Plumbing
Supply, drain and fixture work.
Electrical
Panels, circuits, outlets and lighting.
HVAC
Heating, cooling, ducts and exhaust.
Finishes
Drywall, tile, flooring, paint and trim.
The City lists cabinets and countertops as work that needs no permit, unless the property is on the Philadelphia Register of Historic Places. Moving plumbing, adding circuits or changing walls does need permits, and we pull them for you.
We do, in-house or through our subcontractors. Every trade runs on one schedule under one point of contact, so you never coordinate separate crews yourself.
Yes. After the free estimate visit we give you a clear fixed-price quote for the whole kitchen before any work starts.
We send regular progress updates with photos, so you see the status of the work and the next steps.
Start a project
Ready to start your project?
A free estimate visit, a fixed-price quote and one point of contact from start to finish.




