
Build-outs for business owners
Retail and studio fit-outs completed on schedule and to code, with the documentation your lender or landlord asks for.
The problem
Business owners need build-outs completed on schedule and to code. Most also answer to someone else: a lender who releases money against progress, or a landlord with rules for the space. A late opening means rent on a space you can’t trade from.
How we run it
One point of contact runs the fit-out, on a fixed-price quote. We handle the permits and every trade, in-house or through our subcontractors, and we keep the job documented for your lender or landlord. Regular photo updates tell you the status of the work and the next steps, so you can plan staff, stock and opening day around real dates.
In Philadelphia
- Commercial Activity License. Anyone doing business in Philadelphia needs one. It is free and never needs renewing.
- The smallest jobs. The city’s EZ Limited Commercial Alterations permit covers finish work in one tenant space: a work area of no more than 2,000 square feet and a contract cost of no more than $25,000, with the existing use kept and no structural work or new walls.
- Everything bigger goes through plan review. L&I’s published standard for commercial alterations is 20 business days.
- Certificate of occupancy. You need one after alterations that affect exits or fire ratings, and after a change of use. The city lists 20 business days to process it.
- A new kind of business in an existing tenant space can need a zoning permit for a change of use before any building permit.
Accessibility
Under the federal ADA rules, when you alter an area where the main business of the space happens, you must also make the path of travel to it accessible, including the restrooms and drinking fountains that serve it. The rule stops at the point where that path of travel costs more than 20% of the alteration. Above that line, you still provide as much access as the 20% allows.
Tell us your lease terms and your lender’s draw schedule at the first visit. We build the schedule and the paperwork around them.
Sources
- Get a Commercial Activity License (City of Philadelphia)phila.gov
- EZ Level I Commercial Alterations Standards, 2021 code (Philadelphia L&I)phila.gov
- Get a building permit (City of Philadelphia)phila.gov
- Get a certificate of occupancy (City of Philadelphia)phila.gov
- Get a zoning permit to change the use of a property (City of Philadelphia)phila.gov
- 2010 ADA Standards for Accessible Design, including 28 CFR 36.403 (ADA.gov)ada.gov
How every job runs
One contractor for every trade
We manage the full project and handle the permits, in-house or through our subcontractors.
One point of contact
One person from the first visit to the final walkthrough.
A fixed-price quote
A clear price for the whole project before work starts.
Every trade, one schedule
Structural, HVAC, plumbing, electrical, roofing and finishes.
Photo updates
Regular progress photos with the status and the next steps.
For business owners
The work you hire us for
Each service page explains how the job runs, the permits that apply and what to prepare.
/05Retail and studio fit-outs
Build-outs completed on schedule, to code and to lender or landlord requirements.
- Permits
- Structural
- HVAC
- Plumbing
/06Electrical services
Panels, circuits, lighting and code upgrades, in-house or through our licensed subcontractors.
- Electrical
/07Plumbing services
Supply, drain and fixture work for kitchens, baths and whole properties.
- Plumbing
/08Heating and cooling (HVAC)
Ducted and ductless systems, from the condenser to every room.
- HVAC
Start a project
Ready to start your project?
A free estimate visit, a fixed-price quote and one point of contact from start to finish.
