
Retail and studio fit-outs
We build out retail stores, studios and other commercial spaces on schedule and to code, with the paperwork your lender or landlord asks for. Permits, every trade and photo-documented progress run through one point of contact.
Commercial fit-outs
On schedule and to code
Build-outs completed on schedule, to code and to lender or landlord requirements.
You get a clear fixed-price quote before work starts and one point of contact from start to finish. We pull the permits, run every trade in-house or through our subcontractors, and send regular progress updates with photos, so you know the status of the work and the next steps.
What's included
08 items- Scope review against your lease and landlord requirements
- Zoning and building permits
- Partitions, ceilings and storefront work
- Electrical, lighting and data rough-in
- Plumbing for restrooms and sinks
- HVAC and ventilation
- Finishes, fixtures and millwork
- Lender-ready documentation and photo reports
One fixed price for all of it, agreed before work starts.
How a fit-out works here
A fit-out turns an empty or tired commercial space into a store, a studio or an office that fits your business. Each one has to answer to three parties: the code official, your landlord and, often, your lender. Each has its own list, and the opening date doesn’t move to suit any of them. We run the build so all three lists close out together.
Most of our fit-outs are in Philadelphia, where the Department of Licenses and Inspections (L&I) issues permits through eCLIPSE. We also build out spaces in South Jersey, where the municipal construction official issues permits, and in the Pennsylvania suburbs.
Licences and permits in Philadelphia
- Commercial Activity License. Any person or business that does business in Philadelphia needs one. It’s free and never needs renewing, but get it early.
- Zoning. If the space changes from one use to another, for example from retail to a studio or from commercial to residential, the City requires a change-of-use zoning permit, which L&I lists at five business days. If the established use stays the same, you don’t need one.
- The EZ route. L&I’s EZ Limited Commercial Alterations permit, issued without plans, covers finish work in a single tenant space of up to 2,000 square feet, with a contract cost up to $25,000. The existing use has to stay, and the work can’t include structural changes or new walls.
- Building permit with plans. Anything bigger goes through plan review, which L&I sets at 20 business days for commercial work. For a fee, accelerated review cuts L&I’s part to five business days.
- Historic buildings. On a property listed on the Philadelphia Register of Historic Places, the Historical Commission must approve the work before L&I issues the permit.
- Certificate of occupancy. The City requires one after alterations that affect exits or fire ratings and after a change of use. L&I lists processing at 20 business days, so it belongs on the schedule, not after it.
Applications filed with L&I on or after July 1, 2026 follow the 2021 International Building Code family. Pennsylvania still enforces its 2018 accessibility provisions, because a court blocked the 2021 accessibility updates.
Accessibility
If your business is a public accommodation under the Americans with Disabilities Act, its rule for alterations (28 CFR 36.403) applies. When you alter an area that holds a primary function, a major activity the space is there for, the rule requires an accessible path of travel to that area, including the restrooms, phones and drinking fountains that serve it. The rule treats that path as disproportionate once its cost exceeds 20% of the cost of the alteration. Past that point you still provide as much access as you can within the limit, starting with the entrance. We price the path of travel with the fit-out so it doesn’t surprise you at inspection.
What to prepare
- Your lease, and the landlord’s work letter or tenant improvement rules.
- Your lender’s requirements: draw schedule, inspections, the reports they want.
- The use you plan, the hours, and how many people will be in the space.
- Equipment that needs power, water, gas or ventilation: kilns, sinks, studio lighting, coffee machines.
- Your opening date.
What changes cost and time
We quote after we’ve seen the space and the lease, not from a square-foot rate. These decide the number and the calendar:
- Use. The same use keeps zoning simple. A new use adds a zoning permit and, often, a certificate of occupancy.
- Plans or EZ. Small finish-only work can go EZ. New walls, restrooms or structural changes need plans and review.
- Building systems. Whether the existing electrical service, HVAC and plumbing can carry your equipment.
- Accessibility. The path of travel to the altered area, up to the 20% limit.
- Landlord approvals. If your landlord reviews drawings before work starts, we build that review into the schedule.
How we run it
You get a fixed-price quote and one point of contact from start to finish. We handle permits and codes, and every trade, in-house or through our subcontractors, on one schedule. Our commercial projects are lender-ready: photo-documented reports show the status of the work and the next steps, so you can pass them to your lender or landlord. At handover we walk the space with you, and we stand behind the work we complete.
Sources
- City of Philadelphia: Get a Commercial Activity Licensephila.gov
- Philadelphia L&I: EZ Limited Commercial Alterations standards (2021 code)phila.gov
- City of Philadelphia: Get a building permitphila.gov
- City of Philadelphia: Get a zoning permit to change the use of a propertyphila.gov
- City of Philadelphia: Get a certificate of occupancyphila.gov
- Philadelphia L&I: Accelerated plan review request form (rev. 6.2026)phila.gov
- City of Philadelphia: Get approval for work to a historic propertyphila.gov
- Philadelphia L&I Code Bulletin B-2501: Implementation of the 2021 International Codesphila.gov
- ADA.gov: 2010 ADA Standards for Accessible Design (28 CFR 36.403, alterations and path of travel)ada.gov
- N.J.A.C. 5:23-2: Uniform Construction Code, administration (NJ Department of Community Affairs)nj.gov
Trades on this job
The trades we bring in
All on one schedule, in-house or through our subcontractors, under one point of contact.
Permits
Zoning, building and trade permits pulled for you.
Structural
Walls, beams and floors, coordinated with an engineer.
HVAC
Heating, cooling, ducts and exhaust.
Plumbing
Supply, drain and fixture work.
Electrical
Panels, circuits, outlets and lighting.
Roofing
Roof repairs and replacement.
Finishes
Drywall, tile, flooring, paint and trim.
Yes. Business owners often have to meet lender or landlord requirements on top of the code. Our commercial projects are lender-ready, with photo-documented reports on the status of the work and the next steps.
Not always. L&I's EZ Limited Commercial Alterations permit covers finish work in one tenant space of up to 2,000 square feet, with a contract cost up to $25,000, when the use stays the same and no structural work or new walls are involved. Larger or more complex fit-outs need a building permit with plans.
We handle the permits and coordinate every trade, in-house or through our subcontractors, under one point of contact.
Yes. You get a clear fixed-price quote before work starts.
Start a project
Ready to start your project?
A free estimate visit, a fixed-price quote and one point of contact from start to finish.



