
Getting a renovation permit in Philadelphia
How L&I permits work for a Philadelphia renovation: zoning first, building or EZ permits, trade permits, review times, historic homes and inspections.
Draft for client review. Not legal advice; rules change, so check the linked sources before you rely on them.
Most renovation work in Philadelphia needs a permit from the Department of Licenses and Inspections (L&I). The order matters: zoning first, then the building permit, then the trade permits, then inspections until L&I signs the job off. Here is how each step works for a house or a rental.
Everything runs through eCLIPSE
eCLIPSE is the city’s online permit system (Electronic Commercial Licensing, Inspection, and Permit Services Enterprise) at eclipse.phila.gov. In it you apply for licences and permits, schedule inspections, and ask several city departments to review the same project at once. The city lets the property owner or their authorized agent apply, and agents include contractors, design professionals, attorneys and expediters. You can file yourself, or your contractor can file for you.
Check zoning first
The city’s own wording: “In most cases, you must get a Zoning Permit before you can apply for a Building Permit.” An alteration that keeps the building’s area, height, floor area and legal use the same does not need zoning approval. Adding or removing a residential unit, or turning a commercial tenant space into an apartment or a new business, needs a change-of-use zoning permit.
Zoning review takes 15 business days for one- and two-family applications with plans and 20 business days for the rest. If L&I refuses the permit, you have 30 days to appeal to the Zoning Board.
Work that needs no permit
L&I publishes a short list of work you can do without a permit, as long as the property is not on the Philadelphia Register of Historic Places:
- repairs related to regular maintenance
- pointing masonry
- replacing doors and windows in a one- or two-family house
- painting and papering
- non-fibre floor coverings
- cabinets and countertops
- fences up to 6 ft and sheds of 200 sq ft or less
A new kitchen can start on that list (cabinets and countertops) and leave it the moment a pipe or circuit moves, because plumbing and electrical work carry their own permits.
Building permit or EZ permit
You need a building permit to build, enlarge, change the interior or exterior, demolish, change the occupancy, or make major repairs beyond maintenance. A standard building permit means drawings and a plan review.
EZ permits skip the drawings. L&I processes most of them in 5 business days, and it revokes the permit if the work strays from the published standard. Two matter for homes:
- EZ Alterations covers a one-family house that is the owner’s primary residence. A home the owner doesn’t live in needs an inspection report from a Pennsylvania engineer. Duplexes and multi-family buildings are out. The standard prohibits structural work outright, including party walls, underpinning and excavation. Basement work qualifies only where the space is already habitable, and you can’t add a sleeping room.
- EZ Bathroom and Kitchen covers a one-family home where the room keeps its footprint. A Philadelphia licensed plumbing contractor does the plumbing, and electrical work needs its own permit.
Anything outside those standards goes through full plan review. L&I’s published times are 15 business days for alterations or additions to a one- or two-family dwelling and 20 business days for all others. For a fee, L&I reviews an accelerated application within 5 business days: $350 when you apply, then $1,650 more for a building or combination permit or $700 more for other permit types. The fee is non-refundable and speeds up L&I’s own review only.
Who may do the work
L&I’s rule is that “a licensed Philadelphia contractor must perform the work.” The exception is an existing one- or two-family home where the job needs no electrical or plumbing permit. There the owner who lives in the house, or a contractor registered under Pennsylvania’s Home Improvement Consumer Protection Act, may do it.
The trades have their own rules:
- Electrical: a licensed electrical contractor does all electrical work. The owner or their agent hires a licensed electrical inspection agency, and the building permit comes first.
- Plumbing: a licensed master plumber oversees the work.
- Mechanical (heating, cooling, ducts): a licensed contractor does the work, and a registered sheet-metal technician does any sheet-metal work.
Historic properties
If the property is on the Philadelphia Register of Historic Places, the Historical Commission has to approve the work before L&I issues a building permit. The Commission mostly reviews exteriors, and looks at interiors only when the interior itself is on the register. Review is free. L&I’s 2020 information sheet says staff approve over-the-counter applications within 5 business days, while projects that go to the Commission’s monthly public meeting can take up to 60 days. The no-permit list above doesn’t apply to these buildings, and an accelerated review’s 5-day clock waits until the Commission has signed off.
Inspections and sign-off
You request inspections in eCLIPSE or by calling (215) 255-4040. On a residential building permit, the inspector can visit at each stage: initial site, footing, foundation, damp-proofing, under-slab, framing, insulation, wallboard, a pre-final walkthrough and the final. Plumbing and mechanical permits have rough-in, testing and final inspections. L&I issues the approval documents once every required inspection passes.
A certificate of occupancy applies to new construction, additions, alterations that affect exits or fire ratings, and changes of use. Existing one- and two-family homes are exempt.
The 2021 codes
L&I’s bulletin B-2501 moved the city to the 2021 International Codes (building, residential, existing building, energy, mechanical, plumbing and fuel gas), with the 2020 National Electrical Code. Every application received on or after July 1, 2026 must comply with the 2021 editions. Drawings prepared to the 2018 codes need checking before you file.
How we handle permits
When you hire One Worth, we handle the permits as part of the job: we work out which permits apply, file them, and book the inspections. Where a job touches structure, we coordinate an engineer before anyone cuts. Every trade runs on one schedule, in-house or through our subcontractors, under one fixed-price quote, and one person is your contact from the estimate to the final walkthrough. You get regular progress updates with photos, so you know which inspection has passed and what comes next.
Sources
- Get a building permit (City of Philadelphia)phila.gov
- Get permits without plans: EZ permits (City of Philadelphia)phila.gov
- EZ Alterations permit standard, 2021 code (L&I, PB-001)phila.gov
- EZ Bathroom and Kitchen Alterations permit standard, 2021 code (L&I, PB-026)phila.gov
- Help using eCLIPSE (L&I)phila.gov
- Get a zoning permit (City of Philadelphia)phila.gov
- Get a zoning permit to change the use of a property (City of Philadelphia)phila.gov
- Get an electrical permit (City of Philadelphia)phila.gov
- Get a plumbing permit (City of Philadelphia)phila.gov
- Get a mechanical permit (City of Philadelphia)phila.gov
- Accelerated plan review request form, rev. 6.2026 (L&I, P-030)phila.gov
- Historical Commission prerequisite approval information sheet (L&I, 2020)phila.gov
- Get approval for work to a historic property (City of Philadelphia)phila.gov
- Inspections by permit type (L&I)phila.gov
- Get a certificate of occupancy (City of Philadelphia)phila.gov
- Code Bulletin B-2501: Implementation of the 2021 International Codes (L&I, Oct. 2025)phila.gov
Keep reading
More guides before you build

Finishing a basement in a Philadelphia rowhouse
Party walls, water, egress, ceiling height, radon and permits: what to check before you finish the basement of a Philadelphia rowhouse.

How to check a New Jersey contractor's 13VH registration
Checking a New Jersey home improvement contractor: the 13VH number, insurance, what the contract must include, your three days to cancel, and permits.

How to check a Pennsylvania home improvement contractor
What Pennsylvania's Home Improvement Consumer Protection Act requires: registration, insurance, what the contract must say, deposits and your right to cancel.
Start a project
Ready to start your project?
A free estimate visit, a fixed-price quote and one point of contact from start to finish.
