Plumbing, start to finish
Supply and drain rough-in inside the walls, new sewer laterals and cleanouts in the ground, the water service and the fixtures.
Plumbing gallery
From the trench to the fixture
The work that ends up behind the walls and under the ground, photographed before it was covered.
Supply and drain rough-in5 photos
Supply and drain rough-inPEX manifold with a shut-off on every line
Supply and drain rough-inSupply stub-outs on steel brackets in a wet wall
Supply and drain rough-inPEX supply lines run through a framed floor
Supply and drain rough-inCopper and PEX supply rough-in along a wet wall
Supply and drain rough-inCopper supply rough-in beside a new PVC drain stack
Sewer and underground6 photos
Sewer and undergroundExcavating for a new sewer connection
Sewer and undergroundNew drain lines and cleanouts along the foundation
Sewer and undergroundPVC drain lines in the trench beside the foundation
Sewer and undergroundCleanout riser set in stone
Sewer and undergroundCleanouts on the new sewer lateral, before backfill
Sewer and undergroundSewer lateral and cleanouts in the open trench
Service and fixtures2 photos
Service and fixturesWater meter and new copper service
Service and fixturesToilet set in a new tiled bathroom
Start a project
Ready to start your project?
A free estimate visit, a fixed-price quote and one point of contact from start to finish.
